1993 |
李仁芳, 1993.01, '以市场趋动组织, '., vol. 130603, Jan. 1993 |
1993 |
Johannes K. Chiang*;T. Pfeifer, 1993, 'A Factory-wide Quality Information System based on Hypertext and QFD-towards a Scheme for Co-Design and Simultaneous Engineering, ' Proposal and Communication of Esprit Programmes 93, Commission of European Communities,.(*为通讯作者), vol. 255389, 1993 |
1993 |
Tsaih, R.*, 1993, 'The Softening Learning Procedure, ' Mathematical and Computer Modelling, Vol.18, No.8, pp.61-64.(SCI)(*为通讯作者), vol. 135246, 1993 |
1993 |
26. Venkateswara, V.S;Chen, Chuen-Lung*;Bullington, S.F, 1993, 'An Effective Heuristic for Flow Shop Problems with Total Flow Time as Criterion, ' Computers and Industrial Engineering, Vol.25, pp.219-222.(SCIE)(*为通讯作者), vol. 308539, 1993 |
1993 |
Chen, Chuen-Lung*;Bullington, S. F., 1993, 'Development of a Strategic Research Plan for an Academic Department Through the Use of Quality Function Deployment, ' Computers and Industrial Engineering, Vol.25, pp.49-52.(SCIE)(*为通讯作者), vol. 308538, 1993 |
1993 |
Chen, Chuen-Lung;Bulfin, R.L*, 1993, 'Complexity Results for Single Machine Scheduling Problems with Two Criteria, ' European Journal of Operational Research, Vol.70, No.1, pp.115-125.(SCIE)(*为通讯作者), vol. 308537, 1993 |
1993 |
林柏生, 1993, '关税,经济帐与资本累积-两部门无限期最适动态模型, ' 经济论文丛刊, Vol.21, No.2, pp.229-247.(TSSCI), vol. 252999, 1993 |
1993 |
Tang K.;J. Lo, 1993, 'Determination of the Optimal Process Mean When Inspection is Based on a Correlated Variable, ' IIE Transactions, Vol.25, No.3, pp.66-72.(SCI), vol. 409942, 1993 |
1993 |
Tang J.;K. Tang, 1993, 'A Note on Parallel Equipment Replacement, ' Naval Research Logistics, Vol.40, pp.569-573.(SCI), vol. 409941, 1993 |
1993 |
Ting, C.P.*, 1993, 'Optimal designs on the refinement of the n-way cassification model, ' Utilitas Mathematica, Vol.43, pp.141-154.(SCI)(*为通讯作者), vol. 129750, 1993 |